Upgrading your electrical panel is one of the most important safety and capacity improvements you can make to a home in Richfield, WI. Cold winters, rising EV adoption, and modern appliance loads (heat pumps, electric water heaters, sump pumps) mean older panels can become a limiting factor — or a safety hazard.

Why upgrade your electrical panel now
Many Richfield houses were built decades ago and still rely on undersized panels or fused systems. Signs you need an upgrade:
- Frequent breaker trips when multiple appliances run
- Use of extension cords or space heaters to compensate for insufficient circuits
- Visible corrosion, rust, or warm/flickering outlets
- No room for additional circuits needed for EV chargers, whole-house generators, or new HVAC equipment
- Old fuse boxes, Federal Pacific, Zinsco, or aluminum branch wiring present
Upgrading restores capacity, improves safety with modern breaker technology (AFCI/GFCI), and future-proofs your home for EV charging and generator transfer switches.
Common upgrade types and considerations in Richfield
- Service capacity recommendations: Typical upgrades move homes from 60A or 100A to 200A to handle modern loads. Some modest homes remain safe at 100A with careful load management, but 200A is the common choice for EVs, heat pumps, and multiple large appliances.
- Main breaker vs fused panels: Modern main-breaker panels provide easier shutdown and built-in overcurrent protection. Fused systems are generally replaced for safety and code compliance.
- Panel brands and breaker types: Reputable manufacturer options include Square D, Eaton, Siemens, and GE. Modern breakers include standard thermal-magnetic, AFCI (arc-fault), GFCI (ground-fault), and dual-function breakers required by current code for many circuits.
- Subpanel additions: When the main panel has space constraints or is located inconveniently, adding a subpanel can provide dedicated circuits for garages, workshops, or EV chargers without moving the main service.
- EV charger readiness: Preparing for an EV charger typically means installing a dedicated 40–60A circuit and ensuring the main service has spare capacity. Panels can be upgraded with spaces for additional breakers or with a smart load-management solution.
- Generator readiness and transfer switches: A transfer switch (manual or automatic) isolates essential circuits for safe generator operation and prevents backfeed to utility lines — a key consideration in storm-prone Wisconsin winters.
On-site assessment and diagnostic process
- Load assessment: A certified electrician reviews your existing panel, meter, service entrance conductors, and household load profile (existing appliances, planned additions like EV chargers or heat pumps).
- Service-entrance evaluation: Inspect the meter base, service mast or underground service, grounding electrode system, and any evidence of overheating or corrosion.
- Recommendation report: Based on findings, you receive recommended service sizes (100A, 200A), panel location options, breaker types, subpanel needs, and a permit checklist aligned with Richfield/Washington County requirements.
- Permit & plan submission: Electrical upgrades require local permits and inspections. Plans are prepared to meet National Electrical Code (NEC) requirements and local amendments applicable in Richfield.
Typical timeline for an electrical panel upgrade
- Initial assessment and quote: 1 visit, usually completed the same day or within a few days of request.
- Permit acquisition: Varies by municipality; generally a few business days to a couple of weeks depending on inspection schedules.
- Installation: Simple panel replacements can be completed in one day. Larger upgrades that include service conductor replacement, meter base work, or subpanel installation may take 1–3 days.
- Final inspection and testing: Scheduled after installation; an inspector verifies code compliance and approves service energization.
Safety procedures and post-installation testing
- All work follows lockout/tagout and power isolation procedures before any panel work begins.
- Grounding and bonding connections are checked or upgraded to meet current code.
- Installers perform torque checks on all connections, continuity testing, and verify proper breaker operation.
- Post-installation tests can include thermal scanning to identify hot spots under load, and verifying GFCI/AFCI protection where required.
- A final visual inspection confirms labeling, panel clearances, and safe routing of branch circuits.
Permits and code compliance in Richfield
Electrical panel upgrades require permits and inspections to ensure safety and legal compliance. Work must conform to the NEC and any local amendments adopted by Richfield and Washington County. Typical permit steps:
- Submit scope of work and panel schedule
- Inspections at rough-in (if applicable) and final
- Utility coordination if service equipment or meter changes are required
Expect the installer to prepare the documentation needed for the local building department and coordinate inspections.
Warranties and manufacturer information
- Most panel manufacturers back their equipment with product warranties; breakers and bus components have manufacturer guarantees that vary by brand.
- Installation workmanship warranties are typically provided by the installer and cover labor-related defects for a specified period.
- Retain manufacturer documentation and the installer’s warranty certificate after completion for future reference and transfers of ownership.
Frequently asked questions (FAQs)
Q: How do I know if my service should be upgraded to 200A?
A: If you plan to add an EV charger, whole-house generator, new electric heat, or multiple major appliances, a 200A service provides headroom and flexibility. An on-site load assessment determines whether your existing service can safely support new loads.
Q: Can the main breaker be relocated without changing the panel?
A: Relocation is sometimes possible but depends on the service entrance configuration and utility requirements. Often a full panel upgrade is the more practical and code-compliant solution.
Q: Will the power be off during an upgrade?
A: Yes. Replacing a service or main panel requires the utility or technician to de-energize service points for safe work. Timing is coordinated to minimize disruption.
Q: Is a permit always required?
A: Yes. Panel work is subject to local permitting and inspection to ensure compliance and safety.
Q: Can I add a subpanel later if I don’t want a full upgrade now?
A: Yes. Subpanels are a common way to add circuit capacity without immediate full-service upgrade, but they must be installed correctly and may be limited by the capacity of the main service.
Q: How long does an inspection take after installation?
A: Inspectors typically review the installation on-site and may complete approval the same day or within a short window depending on scheduling.
Q: Are fuse boxes dangerous?
A: Old fuse boxes lack modern safety features and can be a fire hazard; replacing them with a modern breaker panel improves protection and circuit management.
Q: Do modern breakers need to be AFCI/GFCI?
A: Current code requires AFCI and GFCI protection for many circuits; up-to-date installations incorporate these breakers where required.
Maintenance Plan
SILVER PLAN (Heating & cooling packages
Our Silver Plan provides you with year-round, worry-free protection. The benefits include:
$129.95
/plan cost every 6 months
Inspection and cleaning of your system during service visits.
Next-day scheduling & 24-hour emergency service.
Full coverage for labor on repairs due to equipment failure.
15% Discount on all parts for repairs and upgrades.
15% Discount on additional system installation.

2
visits per year
1
year in duration
15%
discount on jobs
Cooling
Lubricate motors
Clean condensate line
Check fan belts
Check performance of system
Change filters
Check contactor points
Check evaporator air temperatures
Check pressure switches
Check wiring & connections
Clean condenser coil
Check refrigerant charge
Check temperature differential
Check operating pressures
Check evaporator coil
Check voltage and AMP draw
Heating
Lubricate motors
Check wiring & connections
Adjust controls if needed
Clean burners/flame sensor.
Adjust combustion air to burners
Check Ohms and amps of furnace
Check blower
Check heat exchanger for cracks (if accessible)
Change filters, standard pleated filters included
Check performance of system
Check air temperature rise
Check C.O. levels